Design Incubator R&D Labs Pvt Ltd (India)


317 Narayan Peth, Op. Dainik Prabhat, Nr. Vijay Talkies, Pune-411030, India
Tel: +91 (0)22 6552 9069
Mail: info@designincubator.com
ServicesTrainingProcessesExpertsClientsContact
Current Workshops
Public Workshops
Onsite Workshops
Testimonials
 
 
 
 


› All Courses › UI Requirements Engg. › Sept '07, Mumbai

For Enquiries:

Write to us:
training (at) designincubator.com

Call Pune Office:
+91 (0) 20 3241 7699

Call Mumbai Office:
+91 (0) 22 6552 9069

Currently Scheduled Standard Public Training Courses

Onsite training customized specially for client's requirements

About the Chief Training Instructor Atul N Joshi

Testimonials from Employers and Participants about the effectiveness of Design Incubator's training

Consulting Services offered by Design Incubator

User Interface Requirements Engineering - Sept '07, Mumbai
Participant practice User Interview Techniques during  Design Incubator's workshop in Oct 07 ‹ Participants practice Interview Techniques on each other during Design Incubator's workshop on Practical User Requirements Engineering (Oct '07)

This workshop focused on learning the practical aspects of user centred requirements gathering, analysis and interpretation.

Participants’ Progress and Learning
Participants’ progress and learning was thoroughly monitored and evaluated during the 2 days of the workshop. Pre and Post workshop tests were conducted to measure the effectiveness of the workshop.

Participants of Design Incubator's workshop write a test ‹ Participants write a test before and after the workshop.


The tests had negative marking for wrong answers, zero marks for not attempting and positive marks for right answers. The pre workshop test average score was 0.22 and the post workshop test average score was 4.56 (both out of 10).
The graph below shows comparison between how participants fared in the pre and post workshop tests.
The average progress of all participants was of 4.34 points out of 10.


A chart comparing before and after test scores of workshop participants


Participants' Feedback About the Workshop
The workshop was broken down into 1.5 teaching hour sessions, typically in sequence of the classes conducted from the morning of the first day till the evening of the last day. This workshop had 13 such individually sessions over 16 hours of total teaching time. Participants were asked to rate each session.
The measurement scale was; 'Not Useful = 0', 'Good to know = 1', 'Very Useful = 2' and 'This was Great! = 3'.
The average rating given by participants across all 13 sessions was 2. Most Participants found the workshop "Very Useful".


Ratings given by workshop participants

© Design Incubator R&D Labs Pvt Ltd, 2005 to 2012| Disclaimer